Welcome to Star Trek Simulation Forum

Register now to gain access to all of our features. Once registered and logged in, you will be able to contribute to this site by submitting your own content or replying to existing content. You'll be able to customize your profile, receive reputation points as a reward for submitting content, while also communicating with other members via your own private inbox, plus much more! This message will be removed once you have signed in.

Sign in to follow this  
Followers 0
Eli Zhu

"Yet Another Dreaded Engineering Report"

Lt.(Jg) Eli Zhu

Assistant Engineer

Engineering Report

Re: Repair status and the likes

 

 

 

 

To: Captain Ayers, Admiral Meve, Lt.Cmdr. Hawke and generally posted on the engineering table.

 

 

- Docking/Air Locks:

With the help of Lt. Dent and engineering team 7, air locks 7 - 14 are current operation and at the best of air lock conditions despite the Ion storm's barrage. Air locks 1-6, 14-17 remains functionless due to computer disconnection and machanism errors.

 

Estimated Repair time for this section ONLY: 6 hours

 

- Computers:

As with docking systems as all other major and minor systems aboard Aegis, the computer core is rendering at its most minimal support, due to ion storm damage the computer core automatically shut down everything to prevent a EPS overload. Also due to the damage, many ODN conduits were either burnt out, ionized, or turned off to prevent further damage from possible EPS overload.

 

A Major part of engineering teams are currently replacing key ODN relay junctions to bring online all major systems, Especially main sensors and lifesupport, main weapons and shields. There is approxmately only 46% of total computer control established using secondary junctions or a bleed/cut off from several functioning main junctions to supply control.

 

Estimated Repair Time On ODN only: 8 hours 23 minutes

 

The Computer core it self is damaged heavily, as reports from CT indictates there is a heavy corruption in data storage, the computer does not properly retrieve and display data. Another Major engineering team is investigating this error but engineering awaits their next report. This damage is yet to be fully surveyed and analyzed therefore this task is an engineering priority.

 

Estimated Repair Time: Unknown, Survey due to arrive in an hour

 

- Weapons:

 

Phasers:

Main Phaser control is currently offline due to computer auto-shutdown of systems to Prevent a Major EPS overload, engineering teams are currently dawning the task of restoring power supply and computer control to Phasers.

 

Estimated Repairs on Phasers Only: 4 hours minimal

 

Disruptors:

Mark X disruptors are currently functional at 12.5%, this however is inadequate power against any class of cruisers and battle ships that is currently used in the Cardassian or the Breen Military. Damaged energy cycling components in the main disruptor array are being replaced and the computer control strengthed.

 

Estimated Repairs On Disruptors Only: 5 Hours minimal

 

Photon Launchers:

Currently Only 2 of the 6 rapid launchers are functional, the functional launchers have a limited ammo of 20 torpedoes each due to transport mechanism difficulties. The other 4 launchers are exhibiting targetting difficulties and prefire miscalculation errors due to limited computer support.

 

Estimated Repairs On Photon Launchers Only: 6 hours minimal

 

Plasma Launchers:

No Engineering teams have returned a report regarding this system as of this hour

 

-Shields:

Main Shield grid is currently online, efficiency of these shields lies at 20%, as computer controls return to the station shield efficiency will increase. Meanwhile engineering teams are replacing damaged components to further increase the efficiency in case of attack.

 

Estimated Repairs On Shields only: 9 Hours minimal with computer complications attached.

 

- Power Plants:

 

Warpcore:

Warp core 1 housed in the primary pylon is operational at only 3%, computer control has been minimal and EPS conduits cannot with stand the full force of the heated plasma. Warp core efficiency will increase as computer control is increased as well as the condition of EPS network becomes better.

 

Estimated Repairs on Warpcore Only: 7 hours minimal with restrictions due to computer and EPS grid integrities

 

Further Reports are coming up as personnel reports are entered.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0