Welcome to Star Trek Simulation Forum

Register now to gain access to all of our features. Once registered and logged in, you will be able to contribute to this site by submitting your own content or replying to existing content. You'll be able to customize your profile, receive reputation points as a reward for submitting content, while also communicating with other members via your own private inbox, plus much more! This message will be removed once you have signed in.

Sign in to follow this  
Followers 0
Veloras Itana

Multi-Tasking Pt. II

Multi-Tasking

Pt. II

"Duty Log Stuffed With Lemon Rice"

 

Itana awoke with a start, fully dressed in the center of her bed with the PADD containing yesterday's diagnostic report on her chest. She'd never set the alarm since she hadn't intended on falling asleep in the first place. Frantically, she glanced at the chronometer. 08:30. "Oh no!" She yelled as she rolled to her feet. "Thirty minutes!" She had half an hour left to shower, change and turn in the report. Tossing the PADD beside her she washed and changed as quickly as possible. As she emerged from the lavatory, she saw Jonas sitting on the bed beside the PADD, looking up at her with a completely innocent __expression.

 

"Thank you soo much, Jonas." She ruffled his head with a sarcastic smile. "I honestly don't know why I put up with you sometimes."

 

Jonas yawned with indifference and fluttered away, hovering by the replicator with a loud yowl. Itana laughed, despite her annoyance and, after giving the padd a quick glance to make sure the report was still there, she ordered Jonas' breakfast and took off down the hallway. She reached engineering with a full three minutes to spare and quickly downloaded the report from her PADD to the ship's database with a sigh of relief.

 

Diagnostics Report:

Level 3 Diagnostic

Cloaking Device Hardware Diagnostic

Stardate 0406.4 09:00 hours

Primary Activation System:

 

Diagnostic examination of the graviton polarity source generator allocated for use with the cloaking device adjunct to the main deflector array showed nominal phase-synchronized output through secondary subspace field distortion amplifiers. The system's primary activation sequence follows, 4 tablespoons butter, divided, 3 tablespoons minced onion, 1 garlic clove, minced, 1 cup white rice,2 cups chicken stock, 1/8 teaspoon salt, 1/2 cup chopped parsley, 3 tablespoons slivered, sun dried oil-packed tomatoes, 1 lemon, juiced, 2 teaspoons grated lemon peel, 2 tablespoons butter, 1 1/2 pounds whole trout, boned. No further output data is determinable at diagnostic levels below level 2. Which would require the cloaking system to be offline.

 

Cloaking Device:

Operating System's Diagnostic:

Level 3:

 

Power:

 

The primary electroplasma supply comes from the EPS taps one through four, on the main power transfer conduits and are allocated for use solely by either the cloaking system or the ablative armor generator as these systems can not be used in tandem. Place 1/3 to 1/2 cup rice into the cavity of the trout. Spoon the remaining rice around the fish. Cover the surrounding rice with aluminum foil, leaving the fish exposed. Bake for about 10 minutes per inch thickness of the stuffed fish.* Bake until the flesh feels firm and flakes easily when tested with a fork. Serve at once.

 

Data:

 

Two redundant major bio-neural trunks link to each of the main computer cores, regulating power and data relay systems to the cloaking device's hardware. Punch dough down to exhaust air. Place onto a lightly floured board. Roll 1/2-inch thick and cut with a doughnut cutter. Recover doughnuts with clean tea towels and allow to rise until doubled in bulk, 45 minutes to 1 hour.

 

Structural Integrity Regulation:

 

The mechanical integrity of the physical spaceframe is augmented by the structural integrity field system. This system provides a network of forcefield segments that compensate for propulsive and other structural load factors that otherwise exceed the design limits of the spaceframe and must remain activated during any cloaked flight manuevers. These systems were installed in addition to standard SIF field generators as an added measure to prevent displacement of space minutia to allow detection

 

Using caution, heat oil to 350°F in a skillet or until a speck of dough dropped into hot fat bobs upon the surface. Fry doughnuts, three or four at a time, until golden brown, turning as necessary. Drain on paper towels.The SIF applies forcefield energy directly to field conductive elements within the spaceframe and increases the load-bearing capacity of the super-structure while cloaked.

 

Two parallel molybdenum-jacketed tri-phase waveguide conduit networks distribute the field energy to the SIF conductivity elements built into the spacecraft framework. Due to the overwhelming power demands made by the cloaking device's primary operating system, crossovers between the Primary Hull and the Engineering Hull permit field generators in one hull to feed the entire spacecraft if necessary. Meanwhile, to prepare glaze, mix boiling water with powdered sugar. Beat well until smooth. Beat in vanilla and two drops of red food coloring to give glaze a pink hue. Glaze doughnuts while still warm. Allow to cool and add sprinkles.

End Report

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0