Welcome to Star Trek Simulation Forum

Register now to gain access to all of our features. Once registered and logged in, you will be able to contribute to this site by submitting your own content or replying to existing content. You'll be able to customize your profile, receive reputation points as a reward for submitting content, while also communicating with other members via your own private inbox, plus much more! This message will be removed once you have signed in.

Sign in to follow this  
Followers 0
Tovan

"hourly reports"

Ensign Tovan

Repair Update log

SD 50309.23

 

       Tovan looks around engineering, main engineering is filled with engineers walking around with tool kits and holding replacement equipment, a few who were working on the warp core has returned with good news, but some with bad ones.

 

       ::Padd beeping::

 

Required equipment:

- 34 replacement bioneuro gel packs

- 2 replacement panels

- a replacement warp core

- 5 replacement phase inducers

- a replacement dilithium suspention frame

 

Repairs Required:

- 4 replicator units, bridge, truma, quarters

- port nacell

- port warp coils

- shield generator 2

- phaser arrays 1-12

- torpedo systems 1-8

- secondary computer processor

- primary computer core

- reaction chamber

- dilithium suspention chamber

- intermix chamber

 

current assignments:

engineering team1:

- crewmen tesier - bridge systems

- crewmen torakrah - warpcore

- crewmen lewis - warpcore

- crewmen hoppkins - warpcore

engineering team2:

- crewmen orakin - deuterium holding tanks

- crewmen fillin - deuterium injectors

- crewmen gund - secondary processors

- crewmen cheng - primary computer pathways

- crewmen shaw - jefferies tubes

- crewmen reed - jerfferies tubes

 

system status:

warp drive: not functional

warp core efficency: 99.64%

life support: functioning at 99.87%

sensors: fully functional

scanners: fully functional

fusion reactors: fully functional

hull intergerty: 76%

shield systems: being repaired

weapons array: being repaired

computer core: reprogramming in progress

impulse engines: being repaired

replication units: partially operational

primary computer processor: 99.94% functional

secondary processors: being repaired

primary computer path way: 77% functional

secondary computer path way: being replaced

transporter systems: fully functional

tractor: being repaired

main power: 99.221%  

auxiliary power: 73.23%

Navigation: fully functional

communications: fully functional

 

good news: warp core is functionally normally with no power surges, or power fluctuations.

 

bad news: the warp core sub systems are damaged and in need of pairs, core shut down sequence will be engaged in the next 1 hour.

 

       

::end record::

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0