Welcome to Star Trek Simulation Forum

Register now to gain access to all of our features. Once registered and logged in, you will be able to contribute to this site by submitting your own content or replying to existing content. You'll be able to customize your profile, receive reputation points as a reward for submitting content, while also communicating with other members via your own private inbox, plus much more! This message will be removed once you have signed in.

Sign in to follow this  
Followers 0
Arch Angel

Threading The Needle

Threading The Needle

 

Duty Log: Angelis,John,A.,Lt.,CAG,2nd.Squadron,420 th.,Light fighter group

U.S.S. Reant NCC-3345-G, Duty log and recommendations.

 

The conversation and SITREP from sciences division have coincided with the original suggested plan of action to assist and augment the placing of mines within the grid as outlined by the Science division. The last encounter with a Romulan war bird has indeed taken a toll above projected damages previously,ending results we as a ship are not within the parameters necessary for the original deployment of the mines necessary to insure limited or denial of Romulan entrance from the worm hole.

 

The past few days have been intense since our last battle and the timely intervention from the U.S.S. Excalibur. The mines allocated to us have proven their worth indeed as a bit of engineering and scientific ingenuity did assist in the destruction of the dead war bird as it's automated systems had locked on Reaent and the fighters on station,two of those beauties managed to take it out...However the resulting damage to systems took a toll.

 

The time for deployment of the remaining mines is upon us,Engineering doing it's very best appears to be in a real dilemma in the original plan for mine deployment as power demands and resources have been diminished greatly.The Reaent must complete the mission prior to departure for much needed repairs. The allocation of the fighter group as an aid is obvious. The necessary revisions of all fighter craft as well as shuttle craft have been performed including delivery points,ramps,for deploying the mines as per grid requirements and positioning.

 

The Reaent in theory should be enabled to devote a majority of power distribution to more dedicated systems including defensive /offensive systems with the diminished work load provided by the fighters and support craft. The Reaent would be able to be at a stand off position...close enough to render aid if necessary,and far enough away to insure survival and escape should the mission turn for the worse along with minimal fighter escort.

 

The trip to Engineering did go well,I am sure the additional assist is greatly appreciated by the Ceng as it frees the engineering division to dedicate additional resources to more critical systems and demands.

 

The final overlay of the grid and interface with the fighters and support craft have been uploaded and will work in conjunction with Engineering and Science...The entire operation should take less than one hour with all dept's. involved working as a unit to insure proper placement of the mines. The mines being placed and upon return to Reaent along with fighter escort perhaps we may proceed onto our destination for much needed repairs. The mission should go without a hitch, No harder than threading a needle. Computer:...End Log...beep.. ;)

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0