Welcome to Star Trek Simulation Forum

Register now to gain access to all of our features. Once registered and logged in, you will be able to contribute to this site by submitting your own content or replying to existing content. You'll be able to customize your profile, receive reputation points as a reward for submitting content, while also communicating with other members via your own private inbox, plus much more! This message will be removed once you have signed in.

Sign in to follow this  
Followers 0
Kallah Ramson

Asst. Engineer's Report

Assistant Engineer's report, Ens Kallah Ramson temporarily assigned reporting.

 

Ship's overall status is fair. EPS grid 39 Alpha has taken major damage but associated systems are being powered by grids rerouted through deck 12 and 13's central EPS lines. This will delay the reactivation of those decks until power can be reverted to proper mains.

 

Ship's weapon's grid is at 79% effectiveness, mostly from power surges and overuse. Fuse circuit replacement in progress. All fuse and safety locks will need to be diagnosed for faults.

 

Shield generator repairs proceeding.

 

Warp core diagnostics underway.

 

Aux generators 1-3 and 6 currently online while secondary EPS lines are repaired.

 

Currently the most prolific problem among the minor systems are coolant leaks and ruptures.

 

For the damage given to this ship, it has held up remarkably well.

 

Once my shift is completed I will see if I am needed to assist with fighter repairs or if sickbay is needing any assistance. I don't believe I will be able to sleep tonight anways.

 

Addendum; I think I broke the CEO's chair........

 

....end log.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0