Welcome to Star Trek Simulation Forum

Register now to gain access to all of our features. Once registered and logged in, you will be able to contribute to this site by submitting your own content or replying to existing content. You'll be able to customize your profile, receive reputation points as a reward for submitting content, while also communicating with other members via your own private inbox, plus much more! This message will be removed once you have signed in.

Sign in to follow this  
Followers 0
WxMurray

Fallout Part II - Damage Report

TO: Colonel C. E. Harper, Lieutenant Javin Prell

FROM: Lieutenant G. Saffir Murray

CC: Lieutenant Commander Benjamin Robair, Captain Simeon Davies

STARDATE: 0604.24

RE: Damage Report

 

Warp core – nonfunctional: antimatter injectors are worn out and overheated; replacement necessary.

 

EPS systems – non-functional, blown out: local EPS waveguides were shorted out to cut power to main engineering, as well as to produce the hypersonic pulse used to neutralize the enemy; replacement of waveguides necessary, level one diagnostic of local EPS systems recommended.

 

Engineering consoles – various states of damage: most were damaged or destroyed by phaser and disruptor fire; replacement necessary.

 

Office (Prell) – structurally unsound: the office was a victim of intense phaser and disruptor fire; complete destruction and reconstruction necessary.

 

Miscellaneous – cosmetic damage: chairs, wall panels, doors, warp core casing suffered cosmetic damage during the firefight; repairs at SCE’s discretion.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0